[{"name":"水利水电","count":511,"id":1},{"name":"设计与施工","count":361,"id":2},{"name":"机电与金属结构","count":331,"id":3},{"name":"电网技术","count":273,"id":4},{"name":"水电站运行","count":270,"id":5},{"name":"经验交流","count":262,"id":6},{"name":"试验与研究","count":248,"id":7},{"name":"水工设计与施工","count":122,"id":8},{"name":"新能源发电","count":100,"id":9},{"name":"岩土工程与勘测","count":75,"id":10},{"name":"龙滩工程建设研究","count":67,"id":11},{"name":"水电工程设计与研究","count":47,"id":12},{"name":"工程施工","count":45,"id":13},{"name":"火力发电","count":40,"id":14},{"name":"洞巴水电站面板坝施工专辑","count":36,"id":15},{"name":"电网工程设计与研究","count":36,"id":16},{"name":"简讯","count":34,"id":17},{"name":"实验与研究","count":33,"id":18},{"name":"试验研究","count":32,"id":19},{"name":"火电工程设计与研究","count":23,"id":20},{"name":"计算机应用","count":22,"id":21},{"name":"企业管理","count":21,"id":22},{"name":"专题综述","count":20,"id":23},{"name":"储能技术","count":19,"id":24},{"name":"应用与研究","count":19,"id":25},{"name":"水工建筑物设计与施工","count":19,"id":26},{"name":"Design and Study of Hydropower Engineering","count":16,"id":27},{"name":"管理经验与交流","count":16,"id":28},{"name":"Design and Study on Hydropower Projects","count":14,"id":29},{"name":"Design and Study on Power Grid Projects","count":14,"id":30},{"name":"大坝安全监测","count":14,"id":31},{"name":"Design and Study of Power Grid Engineering","count":13,"id":32},{"name":"信息化管理","count":13,"id":33},{"name":"水工与施工","count":13,"id":34},{"name":"水工试验与研究","count":13,"id":35},{"name":"水库移民","count":13,"id":36},{"name":"Experience Exchange","count":12,"id":37},{"name":"岩土工程设计与研究","count":12,"id":38},{"name":"专题研究","count":11,"id":39},{"name":"工作研究","count":10,"id":40},{"name":"西藏果多水电站设计专题","count":10,"id":41},{"name":"贵港工程设计","count":9,"id":42},{"name":"Design and Study of Geotechnical Engineering","count":8,"id":43},{"name":"Design and Study on Thermal Power Ptojects","count":8,"id":44},{"name":"万家口子水电站专题","count":8,"id":45},{"name":"工程管理","count":8,"id":46},{"name":"信息化建设","count":7,"id":47},{"name":"应急救援","count":7,"id":48},{"name":"水电与施工","count":7,"id":49},{"name":"水电站运行管理","count":7,"id":50},{"name":"Design and study of Thermal Power Engineering","count":6,"id":51},{"name":"水工建设物设计与施工","count":6,"id":52},{"name":"水库调度运行","count":6,"id":53},{"name":"电网运行与维护","count":6,"id":54},{"name":"科研、设计与施工","count":6,"id":55},{"name":"高坝建设关键研究","count":6,"id":56},{"name":"专家特稿","count":5,"id":57},{"name":"工程监理","count":5,"id":58},{"name":"新能源技术","count":5,"id":59},{"name":"水工建筑","count":5,"id":60},{"name":"科研、设计","count":5,"id":61},{"name":"科研与设计","count":5,"id":62},{"name":"项目管理","count":5,"id":63},{"name":"高坝建设关键技术研究","count":5,"id":64},{"name":"创刊二十周年","count":4,"id":65},{"name":"施工与工程监理","count":4,"id":66},{"name":"机电设计及金属结构","count":4,"id":67},{"name":"水文水资源利用","count":4,"id":68},{"name":"移民安置","count":4,"id":69},{"name":"规划咨询","count":4,"id":70},{"name":"防讯与计算机应用","count":4,"id":71},{"name":"Water and Soil Conservation","count":3,"id":72},{"name":"专题论述","count":3,"id":73},{"name":"安全管理","count":3,"id":74},{"name":"水土保持","count":3,"id":75},{"name":"水库移民及环保述评","count":3,"id":76},{"name":"水文水资源","count":3,"id":77},{"name":"水机设备研究","count":3,"id":78},{"name":"水机设备研究与应用","count":3,"id":79},{"name":"水电企业管理","count":3,"id":80},{"name":"水电档案管理","count":3,"id":81},{"name":"环境保护","count":3,"id":82},{"name":"工程建设监理","count":2,"id":83},{"name":"工程建设管理","count":2,"id":84},{"name":"工程移民","count":2,"id":85},{"name":"水工建筑物","count":2,"id":86},{"name":"水能水文","count":2,"id":87},{"name":"水资源","count":2,"id":88},{"name":"环保述评","count":2,"id":89},{"name":"电力市场","count":2,"id":90},{"name":"电力系统保护与控制","count":2,"id":91},{"name":"通信工程","count":2,"id":92},{"name":"分布式能源","count":1,"id":93},{"name":"地质与勘测","count":1,"id":94},{"name":"工程合同管理","count":1,"id":95},{"name":"工程地质","count":1,"id":96},{"name":"工程建设管理体制","count":1,"id":97},{"name":"工程招投标","count":1,"id":98},{"name":"工程档案管理","count":1,"id":99},{"name":"工程泥沙","count":1,"id":100},{"name":"工程泥沙研究","count":1,"id":101},{"name":"工程测量","count":1,"id":102},{"name":"工程经济","count":1,"id":103},{"name":"工程经济评价","count":1,"id":104},{"name":"工程质量监证","count":1,"id":105},{"name":"工程造价","count":1,"id":106},{"name":"建议","count":1,"id":107},{"name":"总承包管理","count":1,"id":108},{"name":"桩宫凶工程建筑","count":1,"id":109},{"name":"氢能技术","count":1,"id":110},{"name":"水文与水能","count":1,"id":111},{"name":"水文水能","count":1,"id":112},{"name":"水电书评","count":1,"id":113},{"name":"水电监理","count":1,"id":114},{"name":"水资源开发和利用","count":1,"id":115},{"name":"清洁能源","count":1,"id":116},{"name":"火电发电","count":1,"id":117},{"name":"特约专稿","count":1,"id":118},{"name":"环保与移民","count":1,"id":119},{"name":"环境监测","count":1,"id":120},{"name":"环境监测与评价","count":1,"id":121},{"name":"电力系统规划","count":1,"id":122},{"name":"电站运行","count":1,"id":123},{"name":"观测仪器应用","count":1,"id":124},{"name":"读者来信","count":1,"id":125},{"name":"质量管理","count":1,"id":126},{"name":"通航建筑物","count":1,"id":127}]